                            - Western Water - Arnolds Creek Estate, Melton
- Locations and recording of water and sewer reticulation assets for in excess of 900 lots.
 
                       
                     
                   
                
                  
                    
                      
                        
                          
                          
                            - Melton Sewerage OutfallMonitoring of construction accuracy over 6 kms of 1350mm diameter sewerage outfall at
 grades of 1:1450  (in progress).
 
- Goulburn River to Broadford Pipeline24 kms of pipeline survey (in progress). 
- Grantville PipelineAs constructed survey of 16.3 kms of water supply pipelines from Coronet Bay Bore to Candowie Reservoir. 
- Melton Wastewater Treatment PlantMonitoring of accuracy of plant upgrade (in progress). 
- Yarra Valley Water - PRV SitesAs constructed surveys and documentation of 25 installations including preparation of drawings.
 
                       
                     
                   
                 
				
                  
                    
                      
                        
                          
                          
                            - Harrison Investments19 lot industrial subdivision in Melton. 
- Western WaterBacchus Marsh Sewer Outfall - Creation of easement plans through 14 properties.
- Gisborne Sewer Outfall - Creation of easement plans.
- Melton South Sewer Outfall - Creation of easement plans. 
- Rathbone Wine GroupCreation of electricity leases for new office / factory complex.
 
                       
                     
                   
                 
				
                  
                    
                      
                        
                          Construction Surveys
                          
                            - Melton Outfall SewerSurvey of 6km of Outfall Sewer ($14M project) with pipe sizes of 1350mm and grades of 1:1450.
-  
- Survey works included:
- Installation of high precision bench marks for construction control
- Strip Survey for project design
- Construction Set Out
- Monitoring of construction accuracy
- As Constructed Surveys 
- Ringwood South Branch SewerFeature survey for the design of 2.6 kms of outfall sewer in a sensitive location.
- Included entry into 22 existing manholes complying with confined space entry requirements.  
- Bacchus Marsh OutfallFeature and contour survey of existing conditions for duplication of sewerage outfall.	 
- Sunbury to Melton Recycled Water24 kms of strip survey for the design of a Recycled Water pipeline. 
- Bulla to Sunbury Water Supply Main10.4 kms of strip survey for Watermain design.
- As Constructed survey.
 
                       
                     
                   
                 
				
                  
                    
                      
                        
                          
                          
                            - Abigroup Contractors Pty Ltd
- Melbourne to Geelong pipeline - As Constructed survey of 59 kilometres of water supply pipeline.
- Sandgate / Lee Project
- Feature survey of Beach Street and Davey Street Frankston for drainage design (2200 metres)
- Samuel Sherlock Reserve - existing retardation basin survey
- Jubilee Park - Site survey for upgrade of retardation basin. 
- Treyvard Reserve, ChadstoneFeature and contour survey for retardation basin design. 
- Banyan Reserve, Carrum DownsFeature and contour survey.
- Construction set out of basin upgrade. 
- Ballam Park, FrankstonFeature and contour survey for retardation basin design and drainage upgrade. 
- Lee Street, FrankstonFeature and contour survey of retardation basin.
 
                       
                     
                   
                 
                
                
                  
                    
                      
                        
                          Earthworks Surveys
                          
                            - Reservoir C, WoodendComputations of earthworks volumes during the wall stabilisation program. 
- Pierce Reservoir, GisborneComputations of earthworks volumes during the wall stabilisation program. 
- Sunbury Wastewater Treatment PlantSludge Basin Volumes.
 
                       
                     
                   
                 
				
                  
                    
                      
                        
                          Feature and Contour Surveys
                          
                            - Western Water - Candowie Reservoir AugmentationSurveying associated with raising the Phillip Island water supply Reservoir by 3 metres. 
- Candowie Reservoir (225 Mg)Full site survey for Reservoir Raising. 
- Melton Wastewater Treatment PlantFull operational survey for plant upgrade. 
- Silvan Water Treatment PlantSite survey for plant upgrade. 
- Melton Water Treatment PlantFull operational survey of plant. 
- Cowes Wastewater Treatment PlantFull operational survey of plant. 
- Brushy Creek Sewerage Treatment PlantSite survey for plant upgrade. 
- Sunbury Wastewater Treatment PlantFull site survey for plant upgrade. 
- Marriages Basin, WoodendFull site survey of plant. 
- Rosslynne Reservoir Water Treatment PlantFull operational survey of plant. 
- Bacchus Marsh Water Treatment PlantFull site survey of plant.
 
                       
                     
                   
                 
				
                  
                    
                      
                        
                          Monitoring Surveys
                          
                            - Western Water Monitoring of land slip adjacent to the Orde Hill Reservoir at Mt. Macedon. 
- DeBortoli WinesMonitoring of Yarra Valley vineyard major supply dam.
 
                       
                     
                   
                 
				
                  
                    
                      
                        
                          
                          
                            - Westernport W. A.Candowie Reservoir  (225mg) - full survey of reservoir including volume and height computations. 
- Western WaterFeature and contour survey  of 10 reservoirs across the district including Volume / Height computations.  
- Melton Wastewater Treatment PlantFull surveys including Volume / Height computations of Winter Storage Lagoon 1 and Lagoon 2. 
- Djerriwarrh Reservoir, MeltonFeature and contour survey including Volume / Height computations.
 
                       
                     
                   
                 
                
				 
                  
                    
                      
                        
                          
                          
                            - Macedon Sewerage Scheme
- Production of detail mapping over the Macedon township for sewer design purposes.
- Construction Set Out and documentation of 33km of sewer reticulation and 12kms of sewer rising main.
- "As Constructed" recording and documentation for the project. 
- Flinders Sewerage Scheme
- Strip surveys for 21 kms of sewer reticulation design in the Flinders township.
- Strip survey of 16 kms of sewer rising main design from Balnarring to Flinders.
- Western Water - Merrimu Water Treatment Plant
- Site survey and preparation of plant operational plans.
 
                       
                     
                   
                 
				
                  
                    
                      
                        
                          Wine Industry Surveys
                          
                            - Treasury Wine Estates - Fernhill Vineyard Survey, redesign and set out of three fire damaged blocks.